Monday, 15 July, 2002

 

In March 2000 I.D. & Associates supplied two TS2000 Antenna Tracking Control Units to Television New Zealand for installation at Channel 9 in Perth. These systems featured a customised Real Time Clock Modification to meet TVNZ higher time syncronisation requirements (+-30seconds/year).

The Systems where installed on two 13m C Band Antennas shown in rear of photo receiving Television feeds from low elevations in the east and the west, the nearest antenna is a 9 meter Ku band.

Installation time was two weeks with no disruption to operating services for TVNZ. To date there have been no known tracking problems with the two antennas.

[home] [Products] [Capabilities] [Projects] [Links] [Contact]

Site design by Contract I.T.